Back to Research

United States

Cluster Studies Take Hold: What Order No. 2023 Means on the Ground in Late 2024

Workers installing solar panels at Edwards Air Force Base, California
Workers installing solar panels at Edwards Air Force Base, California.Photo: Dawn Waldman, US Air Force, Public domain, via Wikimedia Commons

By September 2024, United States transmission providers are deep into compliance with FERC Order No. 2023 and the March 2024 rehearing order, Order No. 2023-A. The headline reform is familiar: replace serial first-come studies with first-ready, first-served clusters; demand financial readiness and site control; penalise late studies; and modernise modelling for inverter-based resources. The ground-level question is whether those tariff words are shortening time-to-interconnection for projects that can actually build.

Why readiness screens matter more than queue megawatts

FERC reported that at the end of 2022 more than 2,000 gigawatts of generation and storage sat in interconnection queues, with average waits of up to five years. That number inflated public debate. Much of it was speculative. Order No. 2023's readiness deposits and site-control showings exist to flush entries that were never capitalised. Order No. 2023-A clarified that cure rights for defective requests generally end when the cluster request window closes, and that customers facing new readiness rules in a transitioning queue must comply within 60 days of the compliance filing's effective date. Those clarifications reduce gamesmanship.

A smaller headline queue is success only if viable projects move faster. If gigawatts withdraw while median study duration stays near five years, the waiting room is tidier and the clinic is still closed. Analysts should track cluster study completion dates, restudy frequency after withdrawals, and the share of projects that reach interconnection agreements within each cluster cycle.

Interaction with retirements and load

EIA's February 2024 survey planned 5.2 gigawatts of 2024 retirements against 62.8 gigawatts of planned additions. The additions cannot support load or replace firm capacity until they interconnect. Data-centre and manufacturing load growth makes the timing mismatch sharper. Cluster studies that batch many inverter-based resources also force better attention to shared network upgrades, which is where Order No. 1920's long-term planning should eventually meet interconnection reality.

Storage and hybrids

Order No. 2023 updated modelling and performance expectations for inverter-based resources and required evaluation of certain grid-enhancing technologies in studies, while leaving deployment decisions with transmission providers responsible for reliability. Hybrid solar-plus-storage configurations, which dominate many queues, need clear rules on operating assumptions. Ambiguity here recreates restudies. Clarity here is worth more than another press release about queue reform.

Commercial diligence checklist

Lenders should confirm which cluster window governs a project, whether readiness security is posted in acceptable form, withdrawal penalty exposure, how network upgrade costs are allocated inside the cluster, and whether the project's electrical models meet updated inverter-based requirements. State commissions should ask whether study penalties are actually being assessed and whether heatmaps help reduce speculative entry without shifting tool costs unfairly onto load.

Cluster reform is plumbing. Plumbing fails quietly until a peak day. Late 2024 is when compliance filings turn into lived process. That is the moment to measure, not to declare victory.

The practical discipline is unchanged across fuel types and market constructs. Read the primary docket or statistical release before arguing about national destiny. Separate nameplate megawatts from accredited capacity, and contracted offtake from commissioned trains. Map interconnection and transmission lead times onto customer energisation promises rather than the other way round. Treat winter and summer extreme cases as design conditions. When federal policy shifts, update the slope of the forecast without rewriting physical laws. When state commissions push back on cost allocation, treat that push-back as part of the build path rather than as noise. United States energy infrastructure is financed, permitted and operated by people who must reconcile those constraints daily. Analysis that ignores them will not survive first contact with a peak day. Regional operators will continue to publish winter assessments, summer reliability outlooks and interconnection status reports. Those documents, read together with EIA inventories and FERC orders, give a clearer picture than any single speech. Investors should price execution risk honestly. Policymakers should resist the urge to treat one statute or one survey table as the whole system. The grid is a machine. Machines care about margins, not metaphors.

Sources

  • Federal Energy Regulatory Commission, Explainer on the Interconnection Final Rule ferc.gov
  • Federal Energy Regulatory Commission, Explainer on Order No. 2023-A ferc.gov
  • Federal Energy Regulatory Commission, FERC Transmission Reform Paves Way for Adding New Energy Resources to Grid ferc.gov
  • U.S. Energy Information Administration, Retirements of U.S. electric generating capacity to slow in 2024 eia.gov
  • Federal Energy Regulatory Commission, Explainer on the Transmission Planning and Cost Allocation Final Rule ferc.gov

Newsletter

Get The TEI Briefing

A weekly read on energy markets, policy and our latest research. Free, and you can unsubscribe at any time.